LHDN e-Invoice Phase 4 is LIVE — All Malaysian businesses must comply. Check your compliance →
Solutions · Microsoft Power Platform · Power Apps

From 12 spreadsheets to one app · Microsoft Power Apps low-code platform.

Microsoft Power Apps is the Microsoft low-code application platform Malaysian SMEs use to retire 12 spreadsheets and 3 paper forms with one mobile app the field team actually opens. Copilot writes the app from a one-line prompt, drag-drop canvas plus model-driven studios cover both ad-hoc and process apps, AI Builder adds vision and forms processing, Dataverse stores the business data and 500+ connectors wire it into D365, AutoCount, SharePoint, Teams, SQL and Excel. Daxonet ships a working pilot app in 12 days and the production rollout in eight weeks · governed, role-based and Malaysian-data-resident on Day 1.

Built for · Canvas + model-driven Copilot AI AI Builder Dataverse 500+ connectors
Microsoft Power Apps logo
Microsoft Power Apps
What is Microsoft Power Apps?

Microsoft Power Apps is the Microsoft cloud low-code application platform that lets a Malaysian business retire spreadsheets, paper forms and standalone Access databases by replacing them with one mobile, tablet or web app the team actually opens. It covers two studios under one license · canvas apps for pixel-perfect ad-hoc apps the citizen developer drags and drops together, and model-driven apps for process-heavy CRM-style workloads built on top of the Microsoft Dataverse business data platform. Embedded Microsoft Copilot for Power Apps writes the entire app from a one-line prompt · 'build a stock audit app with photo evidence and GPS' returns a working four-screen app in under a minute, complete with Dataverse tables, forms, gallery views and a publish button. AI Builder adds six AI model types · object detection, form processing, prediction, text classification, sentiment and category classification · without leaving the studio. 500+ certified connectors wire Power Apps into D365 Finance, Business Central, Sales, Customer Service, AutoCount Accounting through SQL, SharePoint, Microsoft Teams, Outlook, SQL Server, Excel, Salesforce and the rest of the Malaysian SME stack. The CIO (Chief Information Officer) reads it as governed apps with role-based security, Microsoft Purview lineage and ALM (Application Lifecycle Management) pipelines through dev / test / prod environments. The operations lead reads it as a working app in two weeks instead of a six-month custom-development quote at RM 250,000. Daxonet, a Microsoft Solutions Partner with 10+ years on the Microsoft enterprise stack, delivers a pilot app in 12 days, a Phase 1 production go-live in eight weeks, integrated with D365 and AutoCount on Day 1, with Per-User / Per-App / Premium licensing chosen against your active-app count, PDPA (Personal Data Protection Act 2010) consent on customer-facing apps, Singapore region Dataverse residency and an ALM pipeline the auditor can sign off.

Canvas apps Model-driven · Dataverse AI Builder · Copilot
The build-it-yourself reality in 2026

Why does the operations team still run on twelve spreadsheets and three paper forms?

Three frustrations show up in every Malaysian SME without a developer team. Power Apps removes them by design.

12
spreadsheets

12 spreadsheets · 3 paper forms · 1 broken process

The field team fills a paper form, the office team types it into Excel, the manager copies a summary into a third spreadsheet, and nobody can read any of them on a phone. Power Apps replaces the whole stack with one app the field actually opens.

2022
macro broke

The intern who wrote the macro left in 2022

The Excel macro that calculated rebates broke when the intern who wrote it moved on. Nobody else knows VBA. Power Apps moves the logic into Power Fx and Dataverse · readable by anyone, version-controlled and survives a staff change.

On request
six months

The dev team is six months out · they quoted RM 250,000

The custom-development quote landed at a quarter of a million ringgit and ships next year. Power Apps ships a working pilot in 12 days and a Phase 1 production rollout in eight weeks · for a fraction of the quote.

Six outcomes inside one quarter

What changes when the citizen developer ships an app the field team actually opens?

Six shifts the team feels within 90 days of Microsoft Power Apps going live across the SME stack.

01
Outcome 01

Build apps without code · zero developer headcount

Drag a button onto the canvas. Bind it to a Dataverse table. Publish to iOS, Android and the browser. The citizen developer ships the app · IT does not become the bottleneck.

02
Outcome 02

Copilot writes the app from a one-line prompt

'build a stock audit app with photo evidence and GPS' returns a working four-screen app in under a minute · Dataverse tables, forms, gallery and a publish button.

03
Outcome 03

500+ connectors · D365 · AutoCount · SharePoint · Teams · SQL · Excel

Wire any data source in minutes.

04
Outcome 04

Dataverse · the business data platform under every app

One governed data model the auditor accepts · role-based security, field-level access and Microsoft Purview lineage out of the box.

05
Outcome 05

Native to Microsoft 365 · Teams · SharePoint

Embed apps inside Teams channels and SharePoint pages.

06
Outcome 06

Governed · ALM-ready · role-based · audit-ready

Managed Environments, DLP policies, ALM pipelines through dev / test / prod. Power Platform Admin Centre and Microsoft Purview track every change. The CIO signs off, the auditor finds the trail on Day 1.

Daxonet citizen developer building a Microsoft Power Apps canvas app for a Malaysian SME field team
App built
18 sec
4 screens · Copilot · drag-drop
Live
Published · iOS · Android · web
Capability 01 · Canvas apps

Drag, drop, ship · 100+ controls and zero developer team.

The operations lead drags a gallery onto a blank canvas. The citizen developer drops a form onto the next screen. The IT manager binds it to a Dataverse table and a SharePoint list. Power Apps handles the data binding, the navigation, the offline cache and the publishing across iOS, Android, web and Microsoft Teams. The first working app ships in an afternoon, not three sprints. The team that knows the business builds the app · IT does not become the bottleneck.

  • 100+ controls · button, gallery, form, camera, GPS, signature, barcode scanner · pick the right control for the moment.
  • Offline-first mobile · the field team in Klang or Senai captures records on a phone with no connection · Power Apps re-syncs to Dataverse the next time it sees Wi-Fi.
  • Power Fx formulas · Excel-like syntax the finance lead and the operations lead already read · no JavaScript, no C#.
Capability 02 · AI Builder

Will it read invoices, detect a defect or score a sentiment without a data-science team?

AI Builder ships six AI model types inside the Power Apps studio · object detection, form processing, prediction, text classification, sentiment and category classification. The citizen developer trains a model with sample images or sample documents, drops the model onto a canvas screen and binds the output to a Dataverse field. Daxonet tunes the training set, sizes the AI Builder credit envelope and wires the model into your existing process · invoices, vendor documents, factory parts, customer feedback all read in real time, no data-science team required.

  • Forms processing · OCR vendor invoices, delivery orders and packing lists · feeds straight into AutoCount or D365.
  • Object detection · the inspector walks a production line with a phone camera · Power Apps + AI Builder flags missing components.
  • Prediction · sentiment · classification · forecast lead-quality, route customer feedback, classify support tickets · all from inside the Power Apps studio.
Microsoft Power Apps AI Builder reading invoices and feeding data into Dataverse for a Malaysian SME
AI Builder · 6 model types
Object detect Forms · OCR Prediction Text class Sentiment Category
Capability 03 · Copilot for Power Apps

What does the team retire when Copilot writes the app from a one-line prompt?

Four real before-and-after rows · the manual process retired, the Copilot-built Power App that replaces it, and the time saved.

× Before · manual
Paper field-visit form
Tech writes on paper, supervisor types into Excel, lost on the way to the office.
After · Copilot built this
Field Visit Log app · canvas + Dataverse
Photos, GPS, signature, offline cache, syncs to Dataverse and D365 Field Service.
4.2 hrs / day saved · 18 sec to build
× Before · manual
12-tab stock-audit spreadsheet
Branch managers email Q4_audit_v11.xlsx · CFO reconciles by hand on a Sunday.
After · Copilot built this
Stock Audit app · canvas + AI Builder OCR
Scan barcode, photo of shelf, count auto-extracted, posts to AutoCount Accounting.
2 days / month saved · 32 sec to build
× Before · manual
WhatsApp message · vendor onboarding
Procurement asks for SSM, bank, certs · 11 messages, 3 missing, never archived.
After · Copilot built this
Vendor Onboarding · model-driven app
Self-serve portal, Dataverse, ALM-controlled, finance approves with one click.
5 days lead-time saved · 1 min to build
× Before · manual
Excel macro · sales rebate
Macro broke when the intern left in 2022 · finance recalculates by hand.
After · Copilot built this
Rebate Calculator · canvas + Power Fx
Power Fx formulas, version-controlled, auditor reads the trail · runs on phone or web.
40 hrs / month saved · 24 sec to build
By the numbers

What Daxonet Power Apps customers report after Phase 1.

−74%
Paper forms retired
12-tab spreadsheets folded back into one app
34×
Faster than custom dev
Two weeks vs six months
12 d
App shipping average
Pilot to production · 12 working days
3.5×
IT capacity unlocked
Citizen devs ship · IT focuses on platform
The Daxonet rollout

Pilot in 12 days · Phase 1 in 8 weeks. Discover · Build · Pilot · Scale.

A working pilot app with the operations lead at the keyboard by day 12. The fourth phase scales waves into multi-app suites, AI Builder rollouts and ALM pipelines.

01
Day 1–4
Phase 1 of 4

Discover · process map · Dataverse model

Process audit, Dataverse data-model design, license tier sizing, ALM environment plan, governance baseline.

02
Day 5–10
Phase 2 of 4

Build · canvas · Copilot · AI Builder

Canvas screens, Copilot prompt-tuning, AI Builder model training, connector wiring against AutoCount or D365.

03
Day 11–24
Phase 3 of 4

Pilot · UAT · offline mobile rollout

Pilot release to a 5–10 user group, UAT signoff, offline cache strategy, training, ALM pipeline gates.

04
Week 5–8
Phase 4 of 4

Scale · cutover · loop

Production go-live with hypercare, RBAC sign-off, wave plan for the next three apps, AI Builder credit envelope handed over.

Why Daxonet for Microsoft Power Apps

A Microsoft Solutions Partner that knows your D365 stack, your AutoCount data and your Malaysian field team.

10+ years on the Microsoft enterprise stack. Power Apps is delivered against the same Dataverse and the same accounting data the rest of your business already runs on.

Microsoft Solutions Partner

10+ years on Power Apps, D365, Microsoft Fabric and the broader Microsoft enterprise stack. Working references at Panasonic, Novelis, Raco Industries and Sorento.

Cross-product wiring

Native connectors against AutoCount Accounting, D365 Finance, Dataverse and Microsoft Fabric. The same data model powers every app.

Daxonet team delivering a Microsoft Power Apps implementation for a Malaysian SME field team
Daxonet · Power Apps delivery

Citizen developer enablement

Daxonet trains the operations lead, the finance lead and the IT manager to ship their own apps. The team owns the platform · we keep the platform healthy.

Bilingual · PDPA · Singapore region

English and 简体中文 delivery. PDPA-aligned consent on customer-facing apps. Singapore region Dataverse residency. ALM trail the auditor accepts.

FAQ

Questions Malaysian founders, IT managers and operations leads ask before signing.

What is Microsoft Power Apps and who is it for?
Microsoft Power Apps is the Microsoft cloud low-code application platform that lets a Malaysian business build mobile, tablet and web apps without a developer team.
How does Power Apps license · Per-User, Per-App, Premium, Microsoft 365 seeded?
Power Apps is licensed in three commercial tiers plus a seeded entitlement. The Per-User plan covers an individual user across unlimited apps the organisation builds · the right tier when the team builds many internal apps. The Per-App plan covers one named app for a defined user count · the right tier for one big rollout app like a field-visit log used by 200 technicians. Power Apps Premium is the consolidated tier that adds Dataverse, AI Builder credits and premium connectors. A limited Power Apps for Microsoft 365 entitlement is seeded inside many M365 plans · enough to build apps over SharePoint and Teams data without an extra license. Daxonet builds a tier-by-tier TCO model before contract.
What does Copilot for Power Apps actually do?
Copilot for Power Apps writes the entire app from a one-line prompt · 'build a stock audit app with photo evidence and GPS' returns a working four-screen app in under a minute, with Dataverse tables, forms, gallery views, navigation and a publish button. It also rewrites a screen from a follow-up prompt, generates Power Fx formulas, suggests data sources, drafts the AI Builder model and writes the description that goes on the published app card. Copilot for Power Apps runs on the Premium tier with adequate AI Builder credits. Daxonet tunes the prompt patterns and the Dataverse schema so Copilot answers grounded in your business definitions, not generic Microsoft demos.
Canvas apps vs model-driven apps · which one do we need?
Canvas apps are the right choice when the app is mobile-first, photo-heavy, GPS-aware, ad-hoc and pixel-perfect · field visits, stock audits, inspection forms, signoff apps. The citizen developer drags controls onto a blank canvas and binds them to data sources. Model-driven apps are the right choice when the app is process-heavy, table-driven and follows a CRM-style record lifecycle · service request management, asset registers, vendor onboarding. The model-driven studio generates the UI from the Dataverse data model and business rules. Most Malaysian SME deployments use both · canvas apps on the field, model-driven apps for the back office. Daxonet maps each business process to the right studio in the discovery week.
How does Power Apps integrate with AutoCount, D365 and the Microsoft 365 stack?
Power Apps ships with 500+ certified connectors. D365 Finance, Business Central, Sales, Customer Service and Field Service connect through Dataverse and Microsoft Dataverse Link · zero ETL needed. AutoCount Accounting connects through the AutoCount SQL database via the SQL Server connector. SharePoint, Outlook, Microsoft Teams and OneDrive use built-in standard connectors and run on seeded Microsoft 365 license. SQL Server, Excel, Salesforce, Twilio, ServiceNow, Shopify and 500+ others are also covered. Power Apps also embeds inside Microsoft Teams as a personal app and inside SharePoint pages as a Power Apps web part. Daxonet wires the AutoCount connector with the right gateway and security model.
Does Power Apps work offline on a phone or tablet for the field team?
Yes. Canvas apps run offline on iOS, Android, Windows and the browser via the Power Apps mobile player · the user can capture photos, fill forms and walk a worksite while disconnected. The app caches the active record set, queues writes and re-syncs to Dataverse the next time it sees Wi-Fi or 4G. Daxonet builds the offline cache strategy and the conflict-resolution rules into the data model on Day 1 so the field team in Klang or Senai never loses a record because the connection dropped.
Is Power Apps governed, ALM-ready and PDPA-compliant for a Malaysian business?
Yes. Power Apps runs role-based security and field-level security against Dataverse so each user sees only their authorised slice of data. The Power Platform Admin Centre, environment policies, DLP (Data Loss Prevention) connector classification and Microsoft Purview track lineage, classification and access across every app. Managed Environments adds sharing limits, weekly digests, solution checker enforcement and pipeline gates. ALM runs through Power Platform Pipelines · dev, test and production environments with automated solution promotion. Daxonet provisions Singapore region Dataverse residency for Malaysian tenants, sets PDPA-aligned consent on customer-facing apps and hands the auditor a working ALM trail on Day 1.
How long does a Power Apps rollout take with Daxonet, and what does AI Builder cost?
Pilot app · 12 working days. Phase 1 go-live for a single business process · eight weeks. Discovery, process mapping and Dataverse data-model design takes 1 to 2 weeks. Build, Copilot prompt-tuning, AI Builder model training and the first working app run 4 to 5 weeks. UAT with the operations lead, training, ALM pipeline setup and the offline mobile rollout takes 1 to 2 weeks. Cutover and a 4-week hypercare period closes Phase 1. AI Builder is metered in credits packaged with the Per-User Premium plan or sold as a separate capacity SKU · Daxonet sizes the credit envelope against your forecasted form-processing, OCR and prediction calls before contract.

Ready to retire the spreadsheet rotation and ship one app the field team opens?

Daxonet runs a free 60-minute Microsoft Power Apps discovery for Malaysian founders, IT managers and operations leads. We come back with a TCO model, a license-tier recommendation, the first three app candidates ranked and a 12-day pilot plan you can take to the operations lead and the CIO together.

Hi! What can I do for you?
DAX AI Assistant · Online now